Power-certain AI campuses
No grid delays
Vector delivers hyperscale campuses by combining behind-the-meter generation for immediate energization with grid interconnection engineered in parallel to expand scale, resiliency, and long-term optionality.

POWERING AI CAMPUSES ON HYPERSCALER TIMELINES
Hyperscaler deployment cycles now exceed grid interconnection timelines.
Vector enables near-term energization with onsite power
while the grid catches up.

AI Has Outpaced Grid Capacity
With 3–6 year interconnection lead times across major U.S. markets, grid-first data center development can’t keep up with hyperscaler deployment cycles. Vector solves this gap by energizing AI campuses with behind-the-meter generation first, while grid interconnection progresses in parallel.

Onsite Power As the Default
Modular gas-plus-storage systems are being deployed on AI campuses to accelerate and guarantee power delivery timelines. Vector deploys modular onsite power blocks engineered for AI loads, enabling immediate energization and long-term scalability.

Capital SHIFTS To Gas Value Chain
Capital is shifting toward gas-enabled corridors as the fastest path to energize AI compute. Vector targets these markets, pairing fuel adjacency with data center development for near-term executable capacity.
From Data Centers to
AI Factories
AI workloads are shifting infrastructure toward integrated power-and-compute plants designed for large-scale training, stable power, and high GPU utilization. Vector delivers the power integration
and control AI factories require.
Control
AI factories depend on predictable power delivery - not just megawatts. Vector provides controllable, AI-grade power that minimizes disturbances and performance penalties.

Integration
Power, cooling, and compute must operate as a unified system for dense GPU clusters.
Vector integrates power-first infrastructure with hyperscale data center design.

Coordination
AI factories require coordination between power systems and compute scheduling. We provide a unified operational model for real-time power–compute coordination.

Quality
AI workloads require clean, stable power to maintain utilization and avoid costly interruptions. Vector delivers AI-grade power quality to maximize uptime and workload efficiency.

LET'S BUILD THE FUTURE OF AI INFRASTRUCTURE
Ready to explore how Vector can support your AI infrastructure roadmap?
Our team engages on site selection, power strategy, commercial structures, and full-stack datacenter delivery.